SIMO Europe GmbH
For the paid provision of the SIMO simulation and measurement system to businesses (B2B)
As of: 20 November 2026
These General Terms and Conditions (GTC) of SIMO Europe GmbH, Stahltwiete 21a, 22761 Hamburg (hereinafter "Lessor" or "LG"), apply to the paid provision of SIMO to businesses within the meaning of § 14 BGB, legal entities under public law and special funds under public law (hereinafter "Lessee" or "LN"). They do not apply to consumer contracts.
Individually negotiated agreements in the leasing, rental or trial contract and its annexes take precedence over these GTC in the event of a conflict (§ 305b BGB). This applies in particular to term, remuneration, minimum use, delivery costs, purchase options and extensions.
Conflicting or supplementary terms and conditions of the LN apply only if the LG expressly consents to their application. For future contracts, these GTC apply only to the extent that they are effectively incorporated.
For ongoing business relationships, new versions of these GTC do not become part of the contract merely by publication; their incorporation is governed by the statutory requirements.
SIMO is a technical simulation and measurement system from the manufacturer Wheel, Thessaloniki, Greece, for determining and simulating selected parameters for wheelchair provision. The functions and limits specified in the individual contract, the technical documentation and the operating manual handed over in each case are binding.
SIMO may only be used as intended by instructed, qualified personnel. The professional assessment, provision and safety of the persons cared for remain the responsibility of the LN and its specialist personnel. An independent classification under medical device law is not warranted by this description; the applicable regulatory requirements are to be reviewed separately.
SIMO may be used in medical supply stores, hospitals, rehabilitation clinics and comparable professional facilities for simulation, training and measurement, provided this corresponds to the respectively valid intended purpose. A tipping limit or tipping safety test of the individual wheelchair is not replaced by SIMO.
A contract is formed by corresponding declarations of intent, in particular by signing an individual contract. The actual taking over of SIMO may constitute acceptance if the specific offer and the contract terms were previously available to the LN and the acceptance by taking over is unambiguous.
Components of the contract are the individual contract, these effectively incorporated GTC).
Individual agreements remain effective even if they were not made in a particular form. For evidentiary reasons, amendments should be documented in text form.
The LG issues proper invoices in accordance with the applicable value-added tax requirements.
Agreed monthly billings may be transmitted electronically. Invoice details must meet the respectively applicable tax requirements.
The subject matter of the provision is the SIMO system specified in more detail in the individual contract, including the accessories listed there, in particular, where applicable, camera tripod, cameras, soundbar, controller and cables. Device type, serial number, condition, scope of delivery and recognisable prior damage should be documented in a handover record.
Changes to the scope of delivery or technical features are only permissible to the extent that the agreed fitness for use is not impaired and the change is reasonable for the LN. Material deviations require an agreement.
Software and cloud services are made available for use exclusively to the extent contractually agreed; ownership rights in software are not transferred.
Typical accessories include, according to the specifically agreed equipment, camera tripod, two cameras, soundbar and controller. A replacement delivery or change to the standard scope of delivery is only permissible if the agreed fitness for use is maintained and no unreasonable disadvantages arise for the LN.
Commencement, fixed term, any extension options and ordinary termination are governed by the individual contract. Unless otherwise agreed there, the paid provision begins with the documented operational handover.
A fixed-term contract ends upon expiry of the agreed term without the need for ordinary termination, provided no effective extension has been agreed. A tacit extension solely through continued use is excluded; § 545 BGB is waived, to the extent legally permissible.
The right of both parties to extraordinary termination for good cause remains unaffected.
If a twelve-month initial term with a four-week notice period to the end of the respective twelve-month period is agreed in the individual contract, this provision applies. Ordinary early termination within the agreed fixed term is excluded unless the individual contract provides otherwise or mandatory law applies.
Amount, billing period, due date, payment currency and, where applicable, usage-based charges result from the individual contract. In the absence of a different provision, the LG invoices monthly in arrears; invoices are payable without deduction within 14 calendar days of receipt.
In the event of default in payment, the statutory requirements and legal consequences apply, in particular §§ 286, 288 BGB. Payments are applied in accordance with the statutory rules, unless there is an effective different appropriation of payment.
Charges are exclusive of the value-added tax owed by law, to the extent that this is incurred under the tax rules applicable to the specific service. For cross-border services, the tax treatment is to be determined separately.
If a pro rata first rental instalment is agreed, it is calculated from the actual contractual start of the rental. Payments are allocated in accordance with §§ 366, 367 BGB or an effective appropriation of payment. Statutory claims to default interest and the default lump sum in B2B transactions remain unaffected.
The agreed remuneration may comprise a base rent, flat-rate services and/or expressly specified usage-based charges. Minimum purchases, minimum measurements or separate session fees arise exclusively if they are clearly agreed in the individual contract.
Delivery, set-up, instruction, cloud, updates, maintenance and support are only subject to separate charges to the extent that this is transparently regulated in the individual contract. A service designated as included in the individual contract will not be charged additionally during the agreed term.
Unilateral price adjustments do not take place during a fixed contract term, unless the individual contract contains a separate, transparent and effective adjustment provision. Changes for a follow-on term require an agreement.
As a standard model, the individual contract may provide for a monthly service flat fee, measurement-based charges and a target volume of an average of ten measurements from the second quarter. A binding minimum charge of five measurements per month applies exclusively if it is clearly stated by number and unit price in the individual contract and effectively agreed; it is then incurred even in the event of lower use.
Delivery, transfer and an initial personal instruction as well as return transport may be charged to the LN, to the extent that this is expressly agreed in the individual contract. Statutory changes to value-added tax only have an effect to the extent that the tax is actually owed for the respective service.
For open-ended or extendable contracts, a price adjustment can only be made on the basis of a transparent, separately agreed adjustment clause. The clause must determine the occasion, scope and direction of the adjustment in a comprehensible manner and, where applicable, also take cost reductions into account.
Place of delivery, transport costs, transport insurance and, where applicable, Incoterms result from the individual contract. Without a separate agreement, handover takes place at the agreed place of delivery. If DAP is agreed, the corresponding Incoterms apply in the expressly designated version, to the extent applicable.
Delivery dates are only binding if they have been expressly agreed as binding. In the event of delays, the LG informs the LN without undue delay of the reason and the expected duration. Statutory rights in the event of delay remain in place.
The risk of accidental loss or accidental damage passes to the LN in accordance with the individually agreed delivery terms, otherwise upon proper handover. A blanket transfer of risk already upon dispatch does not apply.
In the event of non-culpable, unforeseeable and unavoidable obstacles to performance, the statutory rules apply; existing rights of withdrawal, termination and damages are not excluded across the board.
The LN supports the acceptance of the delivery at the agreed place. Additional costs of an unsuccessful delivery or repeated delivery attributable to the LN shall be borne by the LN, to the extent that these are necessary and proven.
Unforeseeable events outside the reasonable sphere of influence of the parties, in particular significant transport or operational disruptions, are to be notified without undue delay. In the event of a longer-lasting disruption, the contractual and statutory rights of release apply; a blanket exclusion of all claims for damages does not take place.
The parties document handover, scope of delivery, serial number, functional test and recognisable damage, where possible in a handover record. The LN reports recognisable transport damage and defects promptly in text form to the LG; an additional report to the carrier is advisable.
A failure to give notice or a late notice does not automatically result in SIMO being deemed free of defects or in statutory rights in respect of defects lapsing completely. Statutory duties of inspection and notification of defects, to the extent applicable in the individual case, remain unaffected.
Within the scope of its statutory and contractual obligations, the LG ensures the remedying of defects. The nature and implementation of a permissible repair or replacement provision are coordinated taking into account the interests of the LN.
The LN inspects SIMO upon takeover for externally recognisable damage, completeness and recognisable functional deviations. Complaints are to be documented in text form, if possible without undue delay, to the LG and, where applicable, the carrier.
To the extent that the conditions for remedying defects are met, the LG may, in accordance with the law, choose between proper repair and an equivalent replacement provision, to the extent that this is reasonable for the LN. A replacement device does not have to be brand new, provided the contractually agreed quality is maintained.
The Lessor (LG) is liable without limitation in cases of intent and gross negligence, in the event of culpable injury to life, body or health, under mandatory statutory liability provisions, in particular the Product Liability Act, in the event of fraudulent concealment of a defect and to the extent of expressly assumed guarantees.
In the event of a simply negligent breach of material contractual obligations, the LG is liable exclusively for the damage foreseeable at the time of conclusion of the contract and typical for this type of contract.
Material contractual obligations are those whose fulfilment makes the proper performance of the lease agreement possible in the first place and on whose observance the Lessee (LN) may regularly rely.
In all other respects, the liability of the LG for damage caused by simple negligence is excluded, to the extent legally permissible.
SIMO is a technical simulation and measurement system to support the professional assessment of wheelchair dimensions, seating positions and adjustment options.
The simulation serves to support qualified specialists. It constitutes neither an independent medical or therapeutic decision nor a binding recommendation for a particular wheelchair model or a specific patient provision.
In particular, the simulation does not replace the independent professional review of the determined dimensions, the assessment of the individual provision situation and the necessary verification of tipping behaviour on the specific wheelchair.
The LN undertakes to have SIMO operated exclusively by sufficiently qualified specialist personnel who have demonstrably been instructed.
This includes in particular appropriately qualified rehab technicians, physiotherapists and wheelchair provision specialists, provided they have the required knowledge and documented instruction in the SIMO system.
Persons who have not been instructed may not operate SIMO independently. Use in the context of training or exercises is only permissible under the direct supervision of a sufficiently qualified and instructed specialist.
The LN is obliged to document the instruction of all persons authorised to operate independently by means of a written or electronic instruction record.
The record must at least identify the instructed person, the instructor, the date and the essential training content.
The LN must retain the instruction records during the contract term and present them to the LG upon justified request.
Responsibility for the proper use of SIMO, the care and supervision of patients and the assessment and use of the determined measurement values lies with the LN and its qualified specialist personnel.
This includes in particular:
In accordance with the above liability provisions, the LG is not liable for damage attributable to circumstances for which the LN or the persons deployed by it are responsible and which are not attributable to the LG.
This includes in particular operating errors, disregard of the operating instructions, exceeding the permissible load, deployment of persons who have not been instructed, inadequate patient supervision, improper transfers, self-responsible misinterpretation of measurement results and errors in the individual wheelchair provision.
The LN is responsible for the selection, qualification, instruction and supervision of its employees and other persons deployed.
A liability of the LG for their independent professional decisions or actions is not established merely by the fact that these take place when using SIMO.
The exclusions and limitations of liability in this section also apply, to the extent legally permissible, in favour of the legal representatives, managing directors, employees, agents and vicarious agents of the LG, to the extent that they are held personally liable for damage in connection with the leasing relationship.
The foregoing provisions do not exclude liability of the LG for its own attributable product defects or breaches of duty, to the extent that such liability exists under paragraphs 1 and 2.
Mandatory statutory claims of third parties and any criminal liability remain unaffected.
During the provision, SIMO remains the property of the LG or of the owner entitled under the individual contract. A transfer of ownership takes place only on the basis of a separate effective purchase agreement and after fulfilment of the agreed conditions.
The LN may use SIMO at the agreed location and for the contractual purpose. Changes of location, subletting, passing on to other companies or transport across national borders require the prior consent of the LG in text form; mandatory customs law requirements remain unaffected.
Operation as intended by instructed employees and use in the context of the care of patients is not an impermissible transfer to third parties.
SIMO and all peripheral parts are to be protected against seizure, unauthorised disposal and access by third parties. The LN informs the LG without undue delay of any attempts at access and supports it in enforcing its ownership rights.
The transfer of use to persons who have not been instructed or to third-party companies is prohibited. In the event of serious violations, the LG may terminate extraordinarily under the statutory requirements and demand compensation for the attributable damage.
The LN provides suitable rooms, power supply, secure installation and the operating conditions required under the technical documentation. It treats SIMO with care and observes the operating manual, permissible load and safety requirements.
SIMO may only be operated by sufficiently qualified and instructed persons. The LN documents instructions appropriately, checks the suitability of the use in the individual case and bears responsibility for transfer, supervision and professional assessment in patient provision.
Malfunctions, damage and safety-relevant events must be reported to the LG without undue delay. Repairs, technical modifications or interventions in the software may only be carried out with the consent of the LG or by authorised persons, except to the extent that mandatory law permits otherwise.
To the extent technically necessary and agreed, the LN enables a secure internet connection for updates, remote maintenance or cloud functions. Access to personal data takes place only on a lawful basis and to the agreed extent. An obligation to transmit measurement data relevant for billing exists only under a correspondingly agreed billing model.
The LN ensures the lawful processing of patient data in its area of responsibility. A blanket exclusion of liability by patients is not a prerequisite for use; required information and consents are governed by the applicable data protection and other law.
The LN protects devices and access from unauthorised access and ensures appropriate data backup in its own area of responsibility.
The LN bears electricity, room, air-conditioning, ventilation and other operating-related costs as well as secure installation at the place of use. SIMO is to be set up in a suitable professional environment and protected against unauthorised access.
At least two employees of the LN should be instructed by the LG, unless a different number of trainees is specified in the individual contract. Further persons may be retrained by employees who have already been properly instructed, provided this is technically permissible. A traceable instruction record is to be kept for each instruction.
Operators must have the professional expertise required for wheelchair provision, in particular regarding measurement methodology, suitable seating positions, transfer and care of patients. The LN checks the safety of each use on its own responsibility.
The LN ensures that patients receive the required information and, where applicable, data protection declarations. A blanket waiver of statutory patient rights is not required and cannot effectively eliminate statutory claims.
The following information describes the technical measurement methodology according to the previous status of the SIMO documentation. The current operating manual and the technical specification agreed in the individual contract remain decisive.
SIMO measures under the following provision. The following is measured:
| Seat width | between the side panels, upper edge (The side panels must be vertical) |
| Seat depth | Point 1: extended course of front edge of backrest (edge) to the seat surface Point 2: front edge of seat upholstery |
| Back height | seat surface to upper edge of backrest (front edge) |
| Back angle | the angle to the seat surface |
| Front seat height | from the floor to seat surface front edge (height of frame tube) |
| Rear seat height | from the floor to seat surface at the height of the backrest (frame tube) |
| Footrest front | from the floor to front upper edge of footplate |
| Footrest rear | from the floor to rear upper edge of footplate |
| Lower leg length | The dimension results automatically from the previous ones |
| Footrest angle | The dimension results automatically from the previous ones |
| Frame length | Point 1: extended course of front edge of backrest (edge) to the seat surface Point 2: front edge of footrest |
| Drive wheel pos. | at the 0 point extended course of front edge of backrest (edge) to the seat surface |
| Back sag | Please NOTE: The back simulates a slight back sag of 2cm. It behaves like tightly drawn belt straps on a fitted back. If a back sag is required, the necessary dimension must be deducted from the seat depth displayed by SIMO, otherwise the seat surface will be too long. |
During the provision, the LN maintains appropriate business or professional liability insurance for its activity. Whether and in what amount property insurance for SIMO (in particular fire, tap water, storm, theft and damage) is required is specified in the individual contract.
To the extent that property insurance is agreed, the insured value, deductible, insured risks and obligations to provide proof are to be specified concretely in the individual contract or an annex. An assignment of insurance claims requires a clear, separate agreement, where necessary.
The liability of the LN for loss, destruction or damage is governed by its statutory and contractual responsibility. Normal wear and tear in accordance with the contract is not damage subject to compensation. Liability without fault for all damage is not agreed across the board.
Upon request, the LN provides proof of liability insurance for damage arising from its business and the use of SIMO. The LN further takes out suitable property insurance against fire, burglary theft, tap water, storm and hail and, where possible, operating and transport damage, unless the individual contract provides for a different allocation of risk.
The agreed sum insured should at least correspond to the insured value specified in the individual contract or an appropriate replacement value. Proof of insurance is to be presented upon request; assignments by way of security are made only to the legally permissible and clearly agreed extent.
Loss, destruction and damage are to be reported without undue delay. The LN cooperates in damage mitigation, preservation of evidence and insurance processing. The statutory allocation of risk and claims for its own breaches of duty remain unaffected.
The LG bears the costs of necessary maintenance and repair due to ordinary wear and tear and technical defects, unless the individual contract effectively provides otherwise. For damage demonstrably attributable to the LN, the LN bears the necessary and reasonable repair costs.
After receipt of a sufficiently specific malfunction report, the LG begins fault analysis without undue delay and endeavours to restore operation promptly. A specific repair date or a replacement device is only owed if this is promised in the individual contract or a service agreement; statutory rights of the LN remain unaffected.
In the event of a total loss, loss or destruction attributable to the LN, compensation is based on the actually compensable damage, taking into account age, condition, current value, saved expenses and insurance benefits. A flat-rate compensation amount of EUR 120,000 is not agreed.
In the event of prolonged downtime, the statutory rights to reduction, damages or termination remain unaffected in accordance with their respective requirements.
In the case of damage caused by improper operation, exceeding the permissible total patient load, persons who have not been instructed, impermissible modifications or disregard of the operating instructions, the LN bears the necessary costs for spare parts, technicians and travel, to the extent that it is responsible for the cause.
In the event of a technical defect, troubleshooting generally takes place in stages: (a) remote analysis by a technician, (b) if necessary, dispatch of spare parts and proper installation by qualified personnel under guidance, provided this is safe and permissible, (c) otherwise, repair on site by a technician of the LG or an authorised service provider.
The LG aims to carry out repair within ten working days of a complete malfunction report and the necessary access to the device. A binding ten-day guarantee exists only in the case of an express individual agreement; mandatory rights in respect of defects remain unaffected.
A loss in value that has already been compensated may not be claimed again. In the event of total loss, insurance benefits and saved expenses are taken into account as mitigating the damage.
The lease agreement begins with the delivery and handover of SIMO to the Lessee (LN).
Unless otherwise agreed in the individual lease agreement, the contract term is initially twelve months. The lease agreement is extended in each case by a further twelve months unless it is terminated by a contracting party with a notice period of four weeks to the end of the respective twelve-month period.
Termination requires written form. For compliance with the notice period, timely receipt of the termination by the contracting partner is decisive.
During an agreed twelve-month period, ordinary termination is excluded, unless otherwise agreed in the individual lease agreement.
The LN's obligation to pay the agreed monthly base fee and the contractually owed minimum remuneration for five measurements per month remains in place during the current contract period regardless of actual use.
The right of both parties to extraordinary termination for good cause remains unaffected.
If the lease agreement is terminated early with justification by the Lessor (LG) due to a breach of duty attributable to the LN, the LG may claim the damage compensable under the statutory provisions.
In calculating the damage, the contractual remuneration lost until the regular end of the contract, including agreed minimum remuneration, may in particular be taken into account, to the extent that it constitutes actually compensable damage.
Saved expenses, any other use or rental of SIMO and other offsets required by law are to be taken into account.
Payment claims that have already arisen and are due remain unaffected.
The LG is in particular entitled to terminate the lease agreement extraordinarily for good cause if:
a) the LN falls into default with payment of due lease instalments or other contractual charges to an extent that justifies extraordinary termination under the statutory provisions;
b) the LN permanently ceases its payments or there are specific, demonstrable circumstances which, taking into account the statutory provisions, make continuation of the contractual relationship unreasonable;
c) the LN, upon conclusion of the contract, knowingly gave false information, falsified or in breach of duty withheld information material to the creditworthiness assessment and this information was significant for the LG's decision to contract;
d) the LN passes SIMO on to third parties, sublets it or uses it at an unauthorised location without the required consent of the LG and thereby commits a significant breach of contract;
e) the LN repeatedly has SIMO operated by personnel who are not sufficiently qualified or have not been properly instructed;
f) the LN disregards material safety requirements, the operating instructions or permissible load limits and thereby significantly endangers persons or the leased object;
g) the LN culpably prevents necessary safety, maintenance or repair measures;
h) despite a necessary warning or reasonable period for remedy, the LN continues serious breaches of contract, in particular use of SIMO contrary to the contract, or does not eliminate their consequences.
Where required by law, extraordinary termination presupposes an unsuccessful warning or the unsuccessful expiry of a reasonable period for remedy.
A warning or setting of a deadline is not required if the statutory requirements for this are met.
In the event of a specific significant endangerment of persons or SIMO, the LG is entitled to request the LN to cease the endangering use without undue delay.
After termination of the lease agreement, the LN is obliged to return SIMO, including all peripheral and accessory parts provided, in particular camera tripod, cameras, controller, soundbar, cables and other components provided, without undue delay and completely in accordance with § 17.
Upon return, SIMO must be in a proper and operationally safe condition appropriate to its age and use in accordance with the contract.
Damage that goes beyond ordinary wear and tear in accordance with the contract and for which the LN is responsible is to be compensated in accordance with the contractual and statutory provisions.
Normal signs of wear are not considered damage.
Termination of the lease agreement does not affect payment claims that have already arisen, claims for damage, loss or incomplete return, or other claims of the LG effectively established by law or contract.
After termination of the lease agreement, the Lessee (LN) is obliged to return SIMO, including all peripheral and accessory parts provided, completely to the Lessor (LG) within five working days, unless a different return arrangement was agreed in the individual lease agreement.
The return includes in particular camera tripod, cameras, controller, soundbar, cables and all other components and documents provided.
The return takes place at the contractually agreed place of return. The costs of the return, including necessary packaging, transport and insurance costs, are borne by the LN, unless otherwise agreed in the individual lease agreement.
The LN must pack SIMO properly and transport-safe for the return transport and document the return or handover to the commissioned carrier.
Upon return, SIMO must be in a proper and operationally safe condition appropriate to its age and use in accordance with the contract.
Normal signs of wear arising from use in accordance with the contract are not considered damage.
The LN is liable in accordance with the contractual and statutory provisions for damage, missing components and a loss in value going beyond ordinary wear and tear for which it is responsible.
If SIMO upon return does not correspond to the condition owed under the contract and a loss in value attributable to the LN has thereby arisen, the LG may demand compensation of the demonstrable damage.
This may in particular include necessary repair costs, replacement procurement costs for missing or damaged components and a damage-related loss in value remaining after repair, to the extent that such damage is compensable under the statutory provisions.
Compensation or insurance benefits already paid are taken into account to the extent that they compensate for the same damage. Double compensation is excluded.
If the contracting parties cannot agree on the nature, extent or amount of a loss in value to be compensated, either party may propose an assessment by an independent, professionally suitable expert.
The selection of the expert is made, where possible, by mutual agreement.
The costs of the opinion are in principle borne by the party that commissions it. A different allocation of costs on the basis of statutory claims for damages or a separate effective agreement remains unaffected.
Obtaining an expert opinion does not exclude recourse to the courts.
If SIMO is not returned completely and properly within five working days after termination of the lease agreement and the LN is responsible for the delay, the LG is entitled to demand compensation for use for the duration of the continued withholding.
The monthly compensation for use is calculated on the basis of the monthly base fee plus the equivalent value of five measurements at the unit price per measurement customary at that time.
For months begun, the compensation for use is calculated pro rata temporis on the basis of 1/30 of the total monthly amount per calendar day of the withholding subject to compensation.
The LN expressly reserves the right to prove that no damage or a substantially lower damage or value of use has been incurred by the LG.
Further statutory claims for damages of the LG, in particular due to demonstrably prevented other rental or other damage caused by the late return, remain unaffected. Compensation for use already paid is credited against the same damage. Double compensation is excluded.
Payment of the compensation for use establishes neither an extension of the lease agreement nor a right of the LN to continue using SIMO.
Until SIMO has been completely returned, the LN's obligations regarding careful handling, securing, insurance, protection against unauthorised access and prompt notification of damage continue to apply accordingly, to the extent that they are by their content applicable to the period after the end of the contract.
Further use of SIMO after the end of the contract is not permitted without the express consent of the LG.
The LN must take all necessary and reasonable measures to prevent damage, loss or unauthorised use of SIMO until its return.
There is no claim of the LN to acquire SIMO during or after expiry of the lease agreement.
An acquisition is possible exclusively on the basis of a separate express agreement with the LG or a purchase option agreed in the individual lease agreement.
Until the conditions of an effectively agreed transfer of ownership have been fully met, SIMO remains the property of the LG.
The return of SIMO does not affect payment claims that have already arisen or claims for damage, loss, missing accessory parts or late return.
Further statutory claims of the LG remain in place to the extent that their requirements are met.
The use of SIMO for ordinary patient provision, internal training and professional collaboration within the scope of the agreed purpose of use is permitted.
Research projects, scientific publications, public product comparisons using non-public product data, and significant technical investigations outside the contractual purpose require prior coordination with the LG; mandatory statutory rights remain unaffected. Participation of the LG in every research project is not automatically presupposed.
Research and development projects with SIMO together with hospitals, rehabilitation clinics, universities or other institutions require the prior consent of the LG in text form, to the extent that they go beyond the agreed use or concern confidential know-how or protected functions. Involvement of the LG as a project partner is to be agreed separately.
Copyrights, trademarks, know-how and other intellectual property rights in SIMO, the software, documentation and technical documents that are not generally accessible remain with the respective rights holders.
For the duration of the contract, the LN receives a simple, non-transferable right to use the software required for operation and agreed cloud functions as intended. Scope, technical requirements, availability, maintenance windows and support services are governed by the individual contract and, where applicable, a service description.
Updates may not significantly impair the agreed core functionality without objective reason. The passing on of confidential documents without authorisation is impermissible; uses permitted by law remain unaffected.
Illustrations, drawings, calculations, technical documents and information marked as confidential may not be passed on or published outside the agreed use without the consent of the rights holder.
Passing on access data, circumventing technical protection measures or unauthorised changes to the software are prohibited, unless mandatory statutory rights stand in the way.
The parties comply with the respectively applicable data protection laws, in particular the GDPR and, where relevant, Swiss data protection law. Each party is responsible for the lawfulness of its own processing.
Whether SIMO Europe processes personal data on behalf of the LN in connection with cloud, remote maintenance, support or hosting or is an independent controller depends on the actual data flows and purposes. To the extent that processing on behalf takes place, the parties conclude a contract pursuant to Art. 28 GDPR or in accordance with the relevant statutory requirements before the processing begins.
Patient and measurement data can be personal health data even without names. The LN ensures lawful collection and use in its area of responsibility. A blanket request not to use names does not replace data protection measures.
The parties agree on appropriate technical and organisational protection measures, in particular access control, authorisations, transmission security, data backup and a procedure for security incidents. Details on hosting provider, storage location, sub-processors, deletion periods and remote access are regulated in current data protection or data processing documentation and are not replaced by an unverified static provider statement.
After the end of the contract, data is returned, exported or deleted in accordance with the agreed and statutory requirements. Statutory retention obligations remain unaffected.
To the extent that the cloud is actually operated by Hetzner Online GmbH, the provider, location and, where applicable, sub-processors are specifically designated in the current data protection documents. The actual technical and data protection design is to be confirmed before release of these GTC.
Remote maintenance takes place in accordance with the technically implemented release and authorisation concept. Exclusively active confirmation on the SIMO screen is only warranted if this has been technically demonstrated for all remote access paths.
German law applies, excluding the UN Convention on Contracts for the International Sale of Goods, to the extent that its application comes into consideration at all in the individual case. Mandatory provisions of the state in which SIMO is used or imported remain unaffected.
If the LN is a merchant, a legal entity under public law or a special fund under public law, Hamburg is, to the extent legally permissible, the exclusive place of jurisdiction; mandatory exclusive places of jurisdiction remain unaffected.
In the case of cross-border provision, the parties agree in the individual contract on the delivery clause, importer or procedure holder, customs procedure, responsibility for customs duties and taxes, security deposits as well as export and re-import. The granting of a temporary use authorisation is not guaranteed. Customs and tax law obligations are governed by the applicable provisions.
The LN notifies changes to its business address and the contact details required for performance of the contract without undue delay. The assignment of claims and rights is governed by the statutory provisions; legitimate interests of the LN and mandatory prohibitions of assignment are preserved.
Should individual provisions be invalid, the validity of the remaining provisions remains unaffected in accordance with the law. The statutory provisions take the place of invalid provisions; a reduction to the extent permissible (geltungserhaltende Reduktion) does not take place.
In the event of default in payment, the statutory B2B default interest applies, in principle nine percentage points above the base rate for monetary claims, as well as, where applicable, the statutory default lump sum.
The LG may assign its claims and security rights to third parties to the extent legally permissible. A change of registered office must be notified without undue delay.